Strategic Towns Water Supply and Sanitation Project (Phase 2), Uganda
3
priority regions served: Northern, Central and Eastern Uganda
1.8 million
people to benefit from improved potable water supply
120 km +
of transmission pipelines and multiple pumping stations assessed for compliance
€183.3 million
of construction finance
Project summary
The Strategic Towns Water Supply and Sanitation Project (STWSSP) is a Ugandan government initiative to ensure sustainable drinking water access for multiple regions. RSK supported the project, ensuring it met the requirements for environmental and social impacts based on International Finance Corporation (IFC) Performance Standards and Equator Principles.
The background
The project addresses severe shortages in Uganda’s water distribution system and seeks to upgrade national water security to meet demographic and economic growth pressures. It involves intake works on Lake Victoria and the Victoria Nile, large-scale pumping, water treatment and main pipelines carrying water across the region. To obtain international financing, the environmental and social impact assessment (ESIA) and social risk frameworks required upgrades to comply with IFC Performance Standards, World Bank environment, health and safety guidelines, and lender due diligence expectations.
RSK deployed a team of water engineering specialists, environmental scientists, social experts and environmental and social compliance advisers to undertake a gap analysis and addendum ESIA that would align existing environmental and social studies to IFC Performance Standards 1–8 and Equator Principles. It also developed a framework of environmental and social management plans with specialist risk modules inclusive of gender impact analysis, cultural heritage mapping, plans to manage incoming workers and a stakeholder engagement strategy.
The challenges
Ugandan national permitting frameworks have significant differences to IFC/Equator Principles and African Development Bank (AfDB)/lender conditions, so aligning the differences between national rules and lender requirements was necessary.
Dynamic river-lake systems presented complex hydrology and required cumulative impact modelling for fisheries, biodiversity and water users. In addition, land acquisition and livelihood dependencies in dense rural settlements adjacent to pumping and pipeline corridors created social sensitivities.
Time-sensitive financing milestones had to be met, demanding accelerated ESIA gap rectification without compromising quality of assessment.
The solutions
Regulatory alignment was achieved by designing an integrated permitting register and compliance matrix to map all statutory steps against lender covenants, eliminating any regulatory disparity.
In addition to the cumulative impact modelling for fisheries, biodiversity and water users, climate resilience assessments, water security modelling and social vulnerability analyses were integrated into the hydrology to inform design safeguards.
An engagement roadmap was produced to support community engagement in four districts across three regions, ensuring gender inclusivity and grievance accessibility. Engagement was delivered across community, district and national levels to align with lender and client requirements.
By coordinating among our teams and building lender requirements into the work, including a gender action plan and vulnerable groups strategy, an IFC-compliant ESIA addendum was delivered within 12 weeks. This included scalable monitoring templates and KPI dashboards to introduce environment and social performance tracking throughout construction works.
The impact
Financing clearance was achieved. With IFC and European Investment Bank compliance confirmed, more than €183.3 million in investment into climate-resilient water and sanitation projects has been unlocked.
Gender, vulnerability and human rights were made a key part of the project design and planning. This improved inclusivity in recruitment policy and workforce management plans. Child safeguarding protocols for construction workforce management is now embedded in the contractor pre-qualification.
The infrastructure design is now more resilient to climate change trends and flood risks through revised designs to avoid high-risk areas and accommodate cumulative water extraction demands.
By ensuring resettlement and livelihood support are properly managed within the ESMP process, resettlement governance has been strengthened. This ensures lender-compliant land acquisition protocols prior to mobilisation.