51.3 MW

electricity produced

310 acres

first phase installation area

60,000

homes provided with power

Project summary

Spencer ECA, an RSK Group company, was contracted to provide a range of services for a solar farm installation in the south of England.

The background

Commissioned in March 2014, Chapel Lane Solar Farm is situated in Parley, on the outskirts of Christchurch, near Bournemouth, Dorset. The installation comprises photovoltaic (PV) panels capable of directly converting sunlight into electrical current. The facility is able to produce 51.3 MW of low-carbon electricity, making it the largest solar farm in the UK when energised.

Spencer ECA (part of Spencer Quantum Ltd) was contracted to provide a range of services, including, but not limited to, the procurement of construction services supplier Grupo Isolux Corsan on behalf of developers British Solar Renewables and Eco Sustainable Solutions.

The work included removing unwanted vegetation from the site and recycling the waste into biomass. Dependent on location and usage, the work involved soil stabilisation and the installation of timber mats and sleepers for accessways and platforms, all of which was managed and supplied by Spencer ECA. The team was also responsible for the placement of temporary buildings, including installing and arranging the provision of water and power and supplying generators to the various locations.

Once the accessways and infrastructure were in place, Spencer ECA commenced the groundworks operation that enabled the installation of cables and, consequently, the solar panel foundation-laying and framework construction to commence, in line with the detailed production schedule.

The challenges

Size and nature of the site

The chosen site for the solar installation was vast, spreading across a number of fields and interconnected by a series of tracks and footpaths. There was a large amount of vegetation across the area that required clearing in order to create access from each section to the next.

Timescale

The project involved multiple contractors, so it was imperative that work was carried out on time. Any overruns would cause a chain reaction that would impact the next stage of the production process.

Local and environmental considerations

During the project, there were a number of local and environmental factors to consider. Despite being located in rural countryside, the site is still close to highly populated residential areas, meaning that the team had to take into account potential disturbance to homeowners and local businesses.

Additionally, the project required converting farmlands. As this is a sensitive subject, extra measures needed to be taken in order to ensure that the operation ran in a sustainable and environmentally responsible manner.

The solutions

In order to mitigate the size and timescale risks, Spencer ECA prioritised its operations, engaged with subcontractors and mobilised efficiently for project commencement. All contractors were given a strict deadline and critical schedule overseen by the Spencer ECA project management team to monitor compliance, quality and progress against objectives.

Before work began, an extensive site survey and liaison with Environment Agency representatives took place. Subsequently, a plan outlining the practices and procedures that would mitigate any potential damage to surrounding areas was put in place. Considerations regarding wildlife were taken into account, and the necessary actions were taken to preserve and protect local flora and fauna. Throughout the project, Spencer ECA worked closely with the main contractors and developers to consider the effects of noise, vehicle movements and any visible changes to the landscape.

During the clearance process, all waste materials were recycled in compliance with industry standards, and when the project was completed, the site was handed over with consideration for livestock that would graze adjacent to the panels.

The impact

Thanks to the methodology and the steps taken to review local and environmental considerations prior to commencement, work was carried out with no unexpected delays and the team was able to carry out its work ahead of programme schedule.

The solar farm now provides low-carbon power to three-quarters of the homes in Bournemouth.

Learn more about Spencer ECA

Featured business

Spencer Quantum Ltd

Spencer Quantum Ltd

Providers of land-based and geotechnical services

Spencer Quantum has been providing specialist geotechnical, site and land services to local authorities and blue-chip clients in the highways, construction, environmental and utilities sectors for over 30 years.

Learn more about Spencer Quantum Ltd