Installation of an innovative solar canopy and battery system at Monks Cross
4 months
end-to-end delivery
110 kWp
energy generation capacity
EvoEnergy
client
Project summary
Milestone took the lead contracting role on the first-of-its-kind, solar powered canopy with EV charging hub in York, England.
The background
RSK Group company Milestone partnered with leading renewable energy company EvoEnergy to complete construction on an innovative solar power canopy with electric vehicle (EV) charging hub. This ‘HyperHub’ became the first of its kind at the park and ride service at Monks Cross Shopping Park, York. It will offer an EV charging station combined with on-site renewable generation and batteries capable of balancing the grid. This project was part of major sustainability works commissioned by the City of York Council.
Starting on site in January 2021, Milestone completed the project in four months. The work included the full canopy installation, including management of the site and any required contractor services. The team was able to complete the work while ensuring the site remained open to the public for the duration.
Services provided by Milestone included
- design assistance
- full canopy fabrication, supply and installation
- all canopy foundations
- all trenching works and reinstatement
- charger mounting plinths/posts with integral bollards
- car park reinstatement plus rainwater management
- a fenced area with concrete bases for battery, substation and inverter equipment.
The canopies consisted of 570 m2 of roof sheeting and solar panelling for a 110 kWp solar PV system. The installed system consists of 30 fast (7 kW), 4 rapid (50 kW) and 4 ultra-rapid (175 kW) charging points, all supported by a Tesla battery system (348 kW/507 kWh).
The challenges
To ensure a successful delivery of the project, the team had to navigate an existing floodplain during the build, which required specialist groundworkers. Milestone completed extensive groundworks for the canopy foundations, trenching works and reinstatement, and a comprehensive rainwater management system that connected to the existing underground services.
The solutions
Utilising its in-house fabrication service, Milestone supplied the steel superstructure incorporating all columns, rafters and purlins to British Standard 1090 execution class 2, as well as 570 m2 of roof sheeting. Milestone also completed the installation of the structure and the roofing system.
The impact
Owing to the successful delivery of the project at Monks Cross in summer 2021, Milestone was awarded the second site in the programme at Poppleton Bar Park and Ride. The work at the second location had a full turnkey infrastructure scope, including the fabrication, supply and installation of all required steelwork. Milestone successfully delivered the second HyperHub in the autumn of 2021.
Learn more about MilestoneFeatured business

Milestone Communications
Milestone Communications, established in 2004 and based in Leicestershire, UK, is a specialist contractor providing civil, electrical and mechanical engineering services to the UK’s leading telecoms, renewables and digital media industries. With a team of highly trained experts and in-house delivery crews supported by an office-based team, Milestone offers services across the UK.