Scottish Water PV solar solution at Bathgate Wastewater Works
792
ground-mounted, ballasted PV modules
0.3 GWh
of renewable energy produced by the system every year β equivalent to powering 111 UK households per year
12%
of the Bathgate wastewater treatment siteβs energy requirements now met with solar energy
63 tonnes
of carbon emissions saved by Scottish Water every year
Project summary
Absolute Solar and Wind, on behalf of Scottish Water Horizons, has completed a Β£675,000 photovoltaic (PV) solar project at its wastewater treatment works in Bathgate, West Lothian. The completion of this project forms part of Scottish Waterβs renewable energy drive to achieve net zero emissions by 2040.
The background
Absolute Solar and Wind was awarded the Bathgate project through Scottish Waterβs Renewable Energy Framework. As an approved EPC contractor, Absolute has collaborated with Scottish Water Enterprise for several years, successfully delivering projects across multiple locations. Bathgate is the latest site to be energised, with additional projects set to be undertaken across Scottish Waterβs estate in 2025.
Absolute collaborated with Scottish Water Enterpriseβs operational and project management teams to identify suitable sites, conduct pre-design surveys and studies and develop tailored solar PV solutions. These solutions aim to reduce each siteβs carbon footprint while supporting Scottish Waterβs goal to achieve net zero emissions by 2040. Absolute managed all aspects of design, scope, supply and installation, working closely with local Scottish Water project teams and their subsidiaries to deliver an optimal renewable energy solution.
The challenges
The land at the Bathgate site was unsuitable for ground-mounted solar installations because it was largely unused and overgrown. This required an innovative solution to deliver solar power to the site, a challenge that was compounded by limited access within the siteβs boundary. To ensure the wastewater treatment works remained operational throughout the duration of the work, the treatment works remained live, requiring the Absolute team to navigate a live operational site. Also, because of the age of the motor control centre (MCC) on-site (the point of grid connection), the system did not have the capacity to incorporate the solar PV installation, and an electrical infrastructure solution was needed to enable the solar PV installation to connect.
The solutions
Given that the site was a live operational facility for Scottish Water, Absolute worked closely with the local operations team to coordinate the MCC shutdown β both for the initial survey and later for the connection. In the case of Bathgate, a bespoke solution was needed to enable the solar PV connection owing to the current system having inefficient capacity. This process was carefully planned and executed to ensure minimal disruption. During the design phase, Absolute meticulously scheduled multiple contractors, including the Distribution Network Operator, to streamline the shutdown process and further reduce operational impact.
Proper land preparation during the pre-construction phase was crucial owing to the highly corrosive nature of the soil, which necessitated a specialist mounting kit. A ballasted system was chosen as the most suitable solution, but its implementation required extensive ground preparation by specialist contractors. The Bathgate site had limited access and egress, requiring careful planning for module placement. The layout was strategically designed to facilitate construction while ensuring the site remained fully functional and operational.
During the electrical survey, it was determined that the existing MCC lacked the necessary capacity, requiring a bespoke extension design. Absolute successfully collaborated with the original MCC manufacturer, BGEN, to develop a tailored MCC solution that seamlessly integrated with the capacity requirements of the PV solar system designed for this unique location.
The impact
Absolute Solar and Windβs work on this project has played a crucial role by ensuring efficient design, seamless execution and minimal operational disruption. Through careful planning, collaboration with key stakeholders and the use of innovative solutions, a high-quality renewable energy system tailored to the siteβs specific needs has been delivered.
This project not only contributes to reducing carbon emissions in line with Scottish Waterβs net zero target in 2040 but also enables Absolute Solar and Wind to continue to be a valued partner of Scottish Water in the development of future PV solar solutions across its estate.
By overcoming site-specific challenges and implementing best practices, Absolute Solar and Wind is helping to drive innovation in renewable energy solutions for Scottish Water, further demonstrating that it is a key partner supporting the achievement of renewable energy goals. Beyond the technical benefits, the project will have a lasting positive impact on the community by contributing to a cleaner, more sustainable environment.
Featured business

RSK Renewables
RSK Renewables (formerly Absolute Solar and Wind), established in 2007 and based near Stirling, Scotland, is a leading renewable energy engineering, procurement and construction (EPC) contractor. Its services include the design, supply, installation and maintenance of commercial photovoltaic solar panel systems, solar farms, battery energy storage systems and wind turbines. The company works across many sectors, including utilities, local government, commercial property, agriculture, hospitality, tourism and universities.