£52 billion

phases 1 and 2a budget (2019 prices)

250 mph

train speeds

2033

date of planned operation for Phase 1

Project summary

RSK has been a major contributor to the route optioneering, consenting, design and delivery of the UK’s HS2 project in numerous wide-ranging roles that reflect the company’s multidisciplinary service offering.

The background

High Speed 2 (HS2) is a planned high-speed railway network in the United Kingdom, ultimately intended to connect London to Birmingham, the East Midlands and Manchester, with services to the rest of the North West and North East England and Scotland utilising a spine route and branches and typically running on upgraded existing lines. The system will carry 400-m-long trains capable of carrying 1100 passengers and travelling at speeds of up to 225 mph: faster than most trains in Europe.

Phase 1 of the project involves building infrastructure for the high-speed line from London Euston to north of Birmingham, with operation planned by 2033. Phase 2a will extend the core spine route to the existing railway network hub at Crewe, also by 2033. Further Phase 2b extensions to Manchester and other destinations are under consideration.

HS2’s ambition is to build the most sustainable high-speed railway of its kind in the world.

RSK has been a major contributor to the route optioneering, consenting, design and delivery of the HS2 project in numerous wide-ranging roles that reflect the company’s multidisciplinary service offering. RSK’s earliest involvement with HS2 was in 2009/2010 as a consultant to Heathrow Airport Ltd’s environment team, examining options for a third runway and improved surface access for the whole airport, including an HS2 Heathrow connection and station.

From 2012 onwards, we have worked with various project-affiliated consultants, contractors and directly for HS2 Ltd. In the latter case, for Phase 2, an RSK–Temple consortium was appointed (2013–2017) to support the consultations on the proposed route and undertake the appraisal of sustainability on refinements to the route in the lead up to the Secretary of State’s decision on the recommended Phase 2 route between the West Midlands, Leeds and Manchester.

A summary of RSK’s involvement at various stages in the HS2 project life cycle is presented below.

RSK’ services provided during the life cycle of HS2

Workstreams Route optioneering and selection Primary authorisation Enabling and main construction work Commissioning and close-out
Legal services – Site access management – Technical specialists’ input to Hybrid Bill/Act – Obtaining consents/licences – GIS and data management – Longer-term monitoring and maintenance
Engineering services Outline alignments and designs – Landfill appraisal Preliminary design – Geophysics and ground investigation Detailed design and value engineering – Topographic and utilities mapping Asbestos surveys – Geotechnical and contamination investigations and testing – Materials management plans – Traffic management
Environment services Appraisal of sustainability – Appraisal of sustainability – Carbon emissions – Habitats appropriate assessment Environmental Impact Assessment – Ecology, heritage, landscape, noise and other surveys/assessments – Socio-economic assessment – Specialists’ secondments Environmental minimum requirements and mitigation – Air quality and noise monitoring – Archaeological mitigation work – Environmental management – Habitat creation, translocation, maintenance and – fencing – Landscape/planting design – Protected species translocations – Watercourse surveys and work
Consultation services – Stakeholder consultations – Stakeholder consultations – Stakeholder management and communications

The challenges

Planning, designing, building and operating the HS2 rail network is a large-scale and complex project that is both drawing on the UK’s expertise and benefiting from international experience of high-speed railways. As one of the biggest infrastructure projects ever undertaken in Europe, the skills and resources needed at each main stage are generally beyond the capabilities of individual organisations. As a result, the project employs a vast and complex network of construction companies and consultancies working together to deliver the project on time and budget while also ensuring it adheres to rigorous standards to mitigate negative impacts on the environment.

The solutions

In the late 2000s, RSK assembled and has subsequently grown a dedicated team from across its businesses to coordinate and optimise the group’s approach to providing multidisciplinary services to the HS2 programme. Our continuing success is driven by several key factors. We properly understand the client’s requirements in our fee proposals/quotations and subsequent project delivery, including HS2’s policies and standards and the details and practical application of the High Speed Rail Acts and associated legal requirements. This has proved invaluable in, for instance, our ability to lead on obtaining necessary consents and licences for programme-critical activities. We have carefully planned our human and technical resources to meet short-term peaks and troughs in deployment and develop longer-term strength in depth, with an emphasis on retaining HS2 knowledge and experience within our delivery teams. We innovate where appropriate to help drive efficiency and minimise impacts on communities and the environment. RSK has been a leader in adopting digital data capture, management and near-real-time client access across multiple survey types, including ground investigation, ecology and heritage. Our habitat management specialists have successfully pioneered aspects of woodland habitat and specimen tree translocations.We apply lessons learned to successive work packages, such as identifying and rectifying where programme delays may have occurred and ensuring that all necessary survey data is captured under our right-first-time philosophy. Overall, RSK is perhaps unusual in having been able to mobilise onto the HS2 project some of the UK’s leading technical specialists in a wide range of environmental and engineering disciplines and stakeholder communications, while at the same time undertaking large ‘hands-on’ work packages in areas such as archaeological mitigation, protected species and habitat translocations. Throughout the project, RSK has strived to maintain close collaborative working relationships with HS2 and the other designers and constructors involved, together with the myriad local authorities, regulators and other external stakeholders. We have used our understanding of construction and operational issues associated with the implementation of a large-scale rail infrastructure project to assist our clients in overcoming the above challenges.

The impacts

The sheer scale and ambition of HS2 have inevitably created undesirable impacts on communities and the environment during its planning and construction. RSK continues to play an important part in helping to minimise these impacts and in ensuring the operational HS2 will bequeath a positive legacy for the UK. During the planning stages, RSK has conducted numerous environmental, landscape impact and ground conditions assessments and supported the passage of the hybrid bills through Parliament, helping to highlight mitigation measures needed during route optioneering and selection and through the design stages. In construction, RSK is helping to physically preserve heritage assets and create the green corridor that will integrate the railway into the landscape, thereby conserving, protecting and enhancing communities, land and properties affected by HS2.

Learn more about RSK

Featured business

RSK Environment

RSK Environment

RSK Environment is the founding department of the RSK Group and has an established service offering across the United Kingdom, incorporating strong capability in environmental impact assessment (EIA), environmental consents, including the environmental elements of development consent orders (DCO) and developments of national significance (DNS) applications and sign-off, construction phase sustainability reporting and environmental management and geographic information systems (GIS). It supports clients in delivering major infrastructure and development projects throughout the design, planning consent and construction phases.