Riverbank protection and defence structures in northern Peru
66 km
of embankment protection
2 million cells
per mesh resolution in hydraulic modelling
3492 kmΒ²
of basin area analysed
1000 hectares
of crops protected
Project summary
The Motupe and La Leche river basins in northern Peru experienced severe overflows during Cyclone Yaku in 2023, destroying homes and affecting thousands of people. In response, Amphos 21 Peru, in collaboration with sister RSK Group companies Nicholas OβDwyer and ABM Consulting, designed new riverbank protection structures for the Consorcio RΓos del Norte (CRN) to mitigate flood risks and strengthen climate resilience in the region. The design includes:
- 64 embankments for riverbank protection along the La Leche and Motupe rivers
- 66 km of embankment protection
- 2 million cells per mesh resolution in hydraulic modelling
- 3492 kmΒ² of basin area analysed
- 1000 hectares of crops protected.
The background
In 2023, Cyclone Yaku brought high rainfall to Ecuador and Northern Peru and caused rivers to overflow. This exposed the fragility of basic infrastructure and agriculture, affecting nearly 49,000 people in northern Peru. In response, CRN and the National Infrastructure Authority (ANIN) launched a comprehensive flood protection plan.
Amphos 21 Peru, Nicholas OβDwyer and ABM Consulting developed the detailed design of river defences under an integrated multidisciplinary approach.
Multidisciplinary approach
The project combined technical and management capabilities in a single workflow. Amphos 21 Peru led advanced hydraulic modelling under climate change scenarios, fluvial design and Building Information Modelling (BIM)-based engineering. Nicholas OβDwyer contributed expertise in structural and regulatory design, while ABM Consulting strengthened model management and ensured transparency and traceability of contractual processes. Joint workshops with CRN and ANIN accelerated validation and approval, ensuring solutions adapted to the local context and aligned with global standards.
The challenges
The scope included hydraulic infrastructure to mitigate floods and mass movements in highly vulnerable areas. Key challenges were tight deadlines, fragmented baseline information and the need to integrate hydrology, geotechnics and topography into a reliable model. The initial concept of linear defences had to be modified to incorporate more flexible structures adapted to river dynamics and climate change scenarios.
The solutions
Reference studies in hydrology, geotechnics, topography and hydraulic modelling were updated and calibrated with extreme weather events such as Cyclone Yaku. BIM 4D and 5D technology was introduced, enabling precise planning of construction schedules (4D) and budgets linked to each phase (5D). This innovation ensured technical decisions were backed by dynamic, traceable simulations and reduced coordination risks.
The impact
The design approved on 13 March 2025 introduces riverbank defences that respect natural river dynamics, incorporate environmental sustainability and are optimised for return periods of up to 500 years.
- Technical: Robust, auditable design prepared for extreme weather events such as El NiΓ±o
- Community: Direct protection for more than 13,000 residents and benefits for around 35,000 people, safeguarding 1000 hectares of farmland and essential services
- Sectoral: Raises the standard of hydraulic projects in Peru, demonstrating how BIM 4D/5D integration and an international multidisciplinary approach can be replicated in other critical basins
This solution will achieve protection of homes and communities, safeguarding of agricultural production, environmental conservation and natural water retention, and climate resilience against future extreme weather events. Implementation is led by CRN under contract with ANIN, with phased construction starting in 2025, beginning with priority sections of the Motupe River and progressively extending across both basins.
Featured businesses
Amphos 21
Amphos 21 is a scientific, technical and strategic consulting company founded in 1994 in Barcelona, Spain. Originally established as a specialist scientific radioactive waste management consultancy, the company has now diversified to offer scientific and strategic environmental consulting to the nuclear, mining, water resources, sustainability and oil and gas sectors. It is headquartered in Spain and operates subsidiaries in Chile (founded in 2009) and Peru (founded in 2012).
Learn more about Amphos 21ABM
ABM consists of two specialised businesses and is a consultancy and engineering services company with more than 20 years of experience in delivering projects in the Catalonia market in Spain. Specialising in water and land engineering, it offers efficient and high-quality services to both private companies and public administrations.
Learn more about ABMNicholas O'Dwyer
Nicholas OβDwyer, formed in 1932 and operating in Ireland, the UK, the Middle East and Africa, is a world-leading engineering consultancy, providing water, environmental planning, design, construction supervision, technical and contractor advisory and civil and structural engineering services. It assists a wide range of public and private sector clients, including those in the water, wastewater, tunnelling, transportation, telecommunications, asset management, energy and renewables, climate resilience and construction industries.