Project summary
A high voltage substation, hydroelectric turbine and turbine powerhouse hall provides the needed energy to power Scottish Waterβs Loch Turret Water Treatment Works near Crieff in Perth and Kinross. Because of its age, this infrastructure network is being upgraded to deliver greater resiliency and a more modern turbine system. WGM Engineering has delivered the project as main contractor with support from sister companies CAN Geotechnical and Tarpave.
The background
The energy network at Loch Turret Water Treatment Works is an integral part of the plantβs operations. Because of the age of the infrastructure, Scottish Water has undertaken an upgrade programme, which saw the construction of a new high voltage substation, replacement of the hydroelectric turbines and refitting of the turbine power hall.
The existing hydroelectric turbines were replaced with modern equivalents, which ensures the future resiliency of the site. New control equipment has also been installed, replacing the existing aged assets. To deliver this ambitious programme of works, WGM Engineering delivered the electrical and commissioning works, as well as managing the subcontracting of earthworks, civils and building packages.
WGM Engineering has a long-standing relationship with Scottish Water, delivering multiple projects over many years as part of framework agreements, and has previously delivered two energy projects at Loch Turret Water Treatment Works.
In support of the work carried out by WGM Engineering, CAN Geotechnical and Tarpave have also worked on the upgrades. CAN Geotechnical has conducted geotechnical inspection of the valley area and delivered a risk assessment for working within the vicinity of suspected rockfall events. Owing to the site location in the Highlands, there was a risk of rockfall in the area. Tarpave laid new roads and reinstated access to any areas with restricted access due to the ongoing work.
The challenges
Because the project focused on infrastructure upgrades across three locations on the site β the treatment works, substation and turbine house β careful coordination and planning was vital. Communicating with the team across all three locations and logistical planning to ensure kit and equipment were in the right place and delivered on time were closely considered.
In addition to these considerations, the site is located at the head of Glen Turret and the water works there is the highest above sea level in Scotland at 1178 feet. The treatment works is on a hill sheep farm, which made access, weather and topography a challenge, particularly as parts of the earthworks programme were scheduled to take place over winter.
The solutions
To deliver these upgrades, a team of 20 electrical, commissioning, civil and structural engineers supplied and installed new high/low voltage switchgear and transformers at the substation; replaced aged control equipment at the turbine power hall; installed interconnecting cabling and cable management systems across the substation, turbine and power hall; and delivered building services for the construction of these new infrastructure assets.
To do this in the challenging environmental conditions, the team liaised closely with Scottish Water, the local community and Glen Turret Estate. Programming of works considered weather risk, and construction activities with potential to be impacted by more extreme weather events were scheduled for more favourable seasons. The winter-scheduled earthworks were planned for known season risks and were bolstered by a good winter season, which helped the team keep on track with scheduled works.
Access to the mountain areas was assisted by Scottish Waterβs existing funicular lift, installed for maintenance works and available for the safe movement of kit and equipment up the hill. Further bespoke scaffolds were developed to manage the steep embankments and provide engineering teams with safe access to the infrastructure sites.
The impact
The new substation, turbine and controls are modern technologies that will be resilient into the future operations of the works, enabling effective ongoing maintenance. Prior to the work being undertaken, the system had a limited operational lifespan and now, with upgrades in place, the use of the turbines to power the plant is able to continue for many decades.
Featured businesses
WGM Engineering
WGM Engineering, formed in 1986, is a Scotland-based engineering business. With a team of more than 400 people in its headquarters in central Glasgow, with three further offices in Glasgow and Livingston, it provides end-to-end mechanical, electrical and civil engineering services supported by a technical design team. These services are aligned with strategically located off-site manufacturing facilities that offer a turnkey solution to clients across the UK.
Learn more about WGM EngineeringCAN
The CAN Group, established in 1983, has its head office in Chesterfield and regional bases in London, Bristol, Glasgow and Dublin. CAN is a geotechnical and structural services contractor, utilising specialist access techniques to provide ground engineering, structural installation and maintenance services to the construction and civil engineering sectors throughout the UK.
Learn more about CAN