Demolition and sustainable redevelopment of Demag administrative site
80,000 mΒ³
by volume of demolished administration building
30,000 mΒ³
of mineral materials processed
16,000 tonnes
of concrete rubble recycled on-site
26,000 tonnes
of blast furnace slag disposed of
Project summary
The βDemagβ administration building, situated near the Ruhr River in Wetter, Germany, and constructed in the 1970s, is to be demolished, with the entire site to be used for residential and retail development in the future. All measures were required to be sustainable in line with client philosophy, and reuse of material on-site was key. Althoff & Lang handled the geotechnical and environmental aspects of the project, which required waste management, geotechnical, environmental and planning assessments, and the associated management.
The background
The Demag administration building (now owned by Konecranes) was constructed in the 1970s, along with the extensive surrounding car park areas. The site has been vacant since 2015, and the building will be demolished, with the entire site designated for residential and retail development in the future. In the spirit of sustainability, the site was known internally as βFenixβ, with remediation of contaminated soil on the site and the creation of a sub-base suitable for foundation work for future residential development key aspects of the project.
This conversion required waste management, geotechnical and environmental assessments, planning assessments and the associated management.
Multidisciplinary approach/strategy
While Althoff & Lang covered the geotechnical and contamination remediation aspects of the project, fellow RSK Group companies Dr. Tillmanns & Partner and GeoExperts assisted with the hydrogeology of the site and safety management.
The challenges
The project is complex, covering a large area and multiple technical fields, including geotechnics, hydrogeology, contaminated site remediation and on-site recycling of materials.
In particular, the technical and scheduling coordination of the various project phases was a challenge. Close coordination between partner companies and construction contractors, and the need to align with the regulatory requirements of the authorities and ensure adherence to the relevant deadlines required, was necessary.
The soil below the basement was also known to contain approximately 13,000 mΒ³ of waste slag, which would need to be carefully sorted and disposed of properly. Other damaged materials, such as asbestos cement sheets, were discovered before and during the works.
The solutions
Being a large, complex site, it was crucial to identify requirements at an early stage. Strong project management and clear communication ensured reliability and integrity throughout the project.
Contaminated material, such as the asbestos-containing cement and fireproof doors, was identified and packaged according to legal requirements and then transported to specialist landfill.
With the focus on recycling, a mini-excavator, transported by telescopic handler to higher floors, was used to remove all faΓ§ade and broken materials from the buildingβs single-storey office spaces. All this material will remain on-site and will be released for recycling after sampling.
The concrete rubble will be processed on-site and most will be prepared for later reuse. The aim is to use as much as possible on-site to significantly reduce transport and disposal costs and associated emissions. To do this, a long-reach excavator with a 35 m boom equipped with hydraulic demolition shears was used. This allowed precise dismantling of the reinforced concrete components and the clean separation of the materials. The resulting material is crushed, classified and prepared on-site for subsequent backfilling.
The impact
The project is exemplary for demonstrating how modern land revitalisation can be implemented with sustainability in mind. With the coordinated collaboration of client, deconstruction specialist and environmental consultant, structured dismantling and on-site processing dealt with approximately 30,000 mΒ³ of mineral material.
The approach combines ecological responsibility with technical precision and allowed the reuse of 16,000 tonnes of concrete on-site and the remediation and disposal of contaminated material to leave the ground and soil in better condition than before.
Featured business

Althoff & Lang GmbH
Althoff & Lang, established in 1996 and based in Cologne, Germany, is a land and environmental agency offering a comprehensive range of services to various sectors across the nation. Specialising in geological and geotechnical consulting, the company delivers projects involving building sites, contaminated sites and buildings (including indoor pollutant investigations), urban developments, demolition and excavation, planning, landfills and health and safety assessments.