210 m³

scour hole

450 tonnes

of aggregate

17%

biodiversity net gain delivered

20 years

of reservoir level data studied

Project summary

The Derwent Reservoir, in the north-east of Derbyshire, receives water from the River Ashop via the Ashop inlet. A scour hole – erosion to the foundations of the structure – around 4–5 m deep with an approximate volume of 210 m³ started to undermine the existing concrete structure of this inlet spillway. Coffey Group, on behalf of Severn Trent Water, repaired the damage with engineering and design services from RSK businesses Binnies, Nicholas O’Dwyer and Salix.

The background

The Derwent Reservoir is the middle of three reservoirs in the Upper Derwent Valley. The Ashop inlet allows water to flow from the River Ashop into the reservoir, and the structure in place created scour that occurred beyond its inlet apron. A scour hole around 4–5 m deep with an approximate volume of 210 m³ started to undermine the existing concrete structure of the spillway. The objective of the project was to fill the scour hole and to provide an extension to the existing spillway to prevent further scouring immediately downstream of the inlet.

Salix AquaRockBags were used to repair the damaged structure, Binnies provided lead design services and Nicholas O’Dwyer provided principal design services. Nicholas O’Dwyer began working on the project as part of a framework partnership with Severn Trent Water, appointing Binnies to support the design elements of the work. Through this collaboration, the Salix AquaRockBags were identified as a viable solution following the team’s previous success working with Salix and its products.

Bird’s-eye view of a dam situated next to a river, illustrating the water flow and the dam’s structural features.
Aerial perspective of a dam construction site, featuring heavy machinery and ongoing work on the dam structure.

The challenges

The large scour void occurred from riprap failure at the inlet channel to the Derwent Reservoir. The final design to remediate this had to accommodate challenging site conditions, including the natural landscape, which constrained the site size, with minimal working area for plant and storage. Owing to the site remaining operational throughout the work – both to visitors to the nearby Dambusters Memorial and for Severn Trent Water – the solution employed needed to be minimally disruptive and logistically feasible on the constrained site. To maintain operational use, the reservoir could not be fully drained, which affected access and exposed the unstable edges of the scour hole.

The solutions

To remediate the damage, Salix’s AquaRockBags were chosen because of their logistical benefits, granting greater access and time savings. Over 450 tonnes of aggregate were required to repair the damage through a combination of AquaRockBags and a new gabion basket wall. AquaRockBags were considered an ideal solution to fill the void because the units are malleable, can be filled and prepared off-site and can be easily placed to infill the void.

Given the considerable flows, AquaRockBags were the preferred solution, as they come delivered in two tonne units, reducing the potential for future geotechnical failures. This was completed with a new section of reno mattress and concrete wall connecting to the existing structure. The overall design was sympathetic to the natural landscape, respecting the area’s heritage, and used local materials and local companies for installation.

Carrying out the work in summer was also of benefit to the team; it is the time when the reservoir is naturally at its lowest, offering increased access, and allowed for a gradual rise in water levels after the structure had been stabilised.

The impact

The AquaRockBags enabled the critical repair work to be carried out while the reservoir remained fully operational without increasing the risk of further damage to other areas of the reservoir wall. Using locally sourced stone and limiting the need for concrete in the repair also meant that the project had a limited carbon footprint.

The rockbags and gabions have provided a valuable habitat for invertebrates, as gaps within the stones mimic a natural environment. This solution enabled the project to deliver 17% biodiversity net gain, exceeding statutory levels.

The project received two awards from the Institution of Civil Engineers: the Small Project Award at the Institution of Civil Engineers East Midlands Merit Awards in June 2024 and the Designed in Wales Award at the Institution of Civil Engineers Wales Cymru Awards in October 2024.

Learn more about RSK

Featured businesses

Binnies
Nicholas O'Dwyer
Salix

Binnies

Binnies is a water management business, helping clients across the globe to collect, store, move and treat water and wastewater, plan and manage watersheds and harness the energy embedded in the process. The company finds solutions that manage flood and coastal erosion risk and maintain and enhance the environment without compromising the needs of future generations.

Learn more about Binnies

Nicholas O'Dwyer

Nicholas O’Dwyer, formed in 1932 and operating in Ireland, the UK, the Middle East and Africa, is a world-leading engineering consultancy, providing water, environmental planning, design, construction supervision, technical and contractor advisory and civil and structural engineering services. It assists a wide range of public and private sector clients, including those in the water, wastewater, tunnelling, transportation, telecommunications, asset management, energy and renewables, climate resilience and construction industries.

Learn more about Nicholas O'Dwyer

Salix

Salix joined RSK in February 2020 and is a respected and leading provider of sustainable solutions to river restoration and erosion control projects in the UK. It also provides spillway and shoreline protection, and inland dredging and wetland habitat creation schemes, and has built a unique business as a designer, constructor, manufacturer, distributor and grower rolled in to one single company.

Learn more about Salix