A holistic approach to the energy cost and decarbonisation challenge
The cost of energy is a defining challenge for school budgets across the country
Prices have risen to a record high, and from April the government’s Energy Bill Relief Scheme will end. To achieve long-term cost savings when it comes to energy, decarbonisation must be front and centre.
For many organisations – schools and businesses alike – the financial pressure from this winter’s energy bill has been great. In schools, the challenge has been particularly acute. Finding the balance of maintaining a safe environment for pupil health and wellbeing, keeping site facilities running and managing the associated costs will have weighed on the minds of many in the last year.
In the long term, however, there are valuable solutions available to us that not only manage cost but also support our ambitions towards the carbon agenda and decarbonisation. Taking the two challenges together is driving a change towards energy self-sufficiency and net zero operations. A holistic approach to decarbonising assets through the installation of renewable energy technology on-site achieves reduced operating costs. The key to securing this is in providing a joined-up overview of the whole school site.
Value of a holistic approach
In our work, we often see that additional pressures mean the sustainability and net zero aspirations of institutions are often squeezed backwards into minimal compliance with the building regulations. Mainly down to outlay cost, a minimal compliance approach may result in a pass on the building’s energy regulation; however, taking the least required action is unlikely to result in the best outcome for site-specific circumstances and for ongoing savings. In terms of solar PV panels, if installing a system at the minimum size to meet minimum energy use standards, it is unlikely that the roof space available is being utilised to its fullest, reducing generation potential and in turn lowering potential savings. Reviewing the available roof space and opting for a larger array at the time of first installation offers exponential improvements in pay back as the edge protection, mobilisation and management costs are being incurred only once. From a cost-saving perspective, taking the holistic approach to both energy and carbon that considers individual circumstances and needs will be significant. For example, a 15 kilowatt PV array on a school block, which would provide the equivalent energy need of five standard three-bedroom houses, could repay its capital investment within 20 months.
To gain such benefits, ultimately this means returning to the two inextricably linked factors of energy and carbon and approaching them both together. In practice, an effort to reduce our carbon footprint in line with the 2030 net zero objectives of many schools will also support ambitions to achieve energy self-sufficiency. Taking a holistic approach to these two factors will, in the long term, bring savings on energy often in excess of 10% per year of expected use. Depending on the size of the installation and coupled with energy-saving measures such as improvements in lighting controls and LEDs, the savings can be amplified further. Installing solar PV or a heat pump on-site means that not only is it possible to generate energy to serve the site but also it ensures future resilience and sustainability.
Implementing site-specific solutions
The impact of installing a renewable energy source on-site will vary by investment, which only emphasises the importance of reviewing the full site to ensure potential is maximised. At sites that have high heating and hot water load, such as schools with on-site pools and showers, heat pump technology will have a bigger impact compared to where there is a lower requirement for heating. Air source heat pumps are electrically driven, utilising refrigerant cycles to convert ambient energy in the air into usable heat for buildings, and therefore reduce reliance on gas. Where they can be used in conjunction with a future decarbonised electricity grid – or on-site solar panels – they are a very efficient way to service the heat demands and reduce the carbon footprint. Installing both solar PV and an air source heat pump has the added benefit of the two systems working together. Solar PV increases the building’s self-sufficiency and on-site generation capacity while the heat pump uses this ‘free’ electricity to serve the heating, cooling and hot water needs of the school. A good understanding of the school’s utilities, mechanical and electrical infrastructure is essential to help inform the best systems to install.
While a change to energy infrastructure will bring these big long-term energy savings, it’s important to balance all decarbonisation options in the arsenal to achieve the best outcome. Small-scale measures such as upgrading the lighting system to support LED lamps and improving the insulation in buildings across the site will take that energy saving further.
What actions can be taken to get started?
Once small interventions have been achieved – improving insulation, for example – the best next step is to define a strategy and budget for renewable systems based on the layout of the building and its energy use profile, including the condition of its cladding and cavity wall insulation. Understanding the starting point and what is to be achieved will enable informed and strategic decisions to be made as to the most appropriate interventions for the site.
These assessments will need to consider the roof structures to check for suitability to take the weight of solar panels or air source heat pump condensers. On any building, installing solar power introduces an additional maintenance and edge protection need. For those looking to air source heat pumps, upgrades to pipework may outweigh feasible return on investment, so it’s vital to build a full picture of required works to inform decisions. The heating pipework in traditional gas-fired boiler systems is smaller than that of heat pumps and will often require replacement; however, underfloor heating systems are typically easier to adapt for use with an air source heat pump.
Benefits of on-site renewable generation
Even though there are practical considerations to take into account when assessing the best systems for a site, the benefits of installing solar PV and heat pump technology are vast. Creating energy self-sufficiency and cost savings across energy need is a big and often deciding benefit, but there are many others.
Installation of renewables enables the school to lead by example: it becomes an education tool for the students and a story to tell their parents. Actively reducing the school’s carbon emissions is a priority not only for leaders but also for students, who are ever more aware of the need to act on carbon and transition towards a One Planet Living mindset. In the long run, on-site generation means greater resilience for the future.
Adam Harrington is a director at Ceetech, a renewables, mechanical and electrical (M&E) design, installation and maintenance specialist based in East Anglia and operating across the UK. Adam has over 25 years’ experience delivering M&E projects for the public and private sectors and is a Chartered Member of the Chartered Institution of Building Services Engineers (CIBSE). As part of the RSK Group of companies, Ceetech is able to draw on a suite of expertise from across the group to deliver the best solution.
First published in the summer issue of the Independent Schools’ Bursars Association (ISBA) The Bursar’s Review magazine.
Featured business

Ceetech
Ceetech, based in Ipswich, UK, is a mechanical, electrical and maintenance services company operating across East Anglia, the Home Counties and the Greater London area. It works in a wide range of sectors, including manufacturing, farming, education, retail, government institutions, military, emergency services and energy.